Skip to Content
Course content

Winalum GERP ODOO (joinery)

Aluminium and PVC joinery: quotes by chapters with the drawing of each window and the price material by material, quote builder, measuring visits with the phone, appointments, signing by link, production with times per operator, cutting list and cutting sheet with offcuts, material orders, CTE and CE marking, the module and material catalogue, and importing from WinAlum 5 and from the wholesaler catalogue.

1. WinAlum dashboard

The joinery's start screen: figures for the work in progress, tabs with the quotes, production and visits, and the buttons for the other sections. It only appears in the companies that have «WinAlum in this company» ticked.

WinAlum dashboard

▶ In motion: WinAlum dashboard, point by point.

  • 1Five figures. If you press one, the list below is filtered automatically: the amount of the active quotes, those accepted this year (with the % of all quotes made), the accepted ones that still have no sales order, the openings still to be manufactured and the visits that still have no quote.
  • 2The dashboard's three lists: quotes, production (one task per opening) and measuring visits.
  • 3Search by number, job or customer; in production, by opening, quote or customer; in visits, by number, customer or address.
  • 4The list filters. In production they are «To do», «In progress», «Finished» and «All»; in visits, «Without quote» and «All».
  • 5The list. A click opens the record.
  • 6The buttons for the other sections. You only see the ones the administrator has given you in Internal users.

2. The joinery quote

By chapters, with the drawing of each window. The price comes from the catalogue, material by material: the price of each material in the line's colour plus its family's % for the rate.

The joinery quote

▶ In motion: the joinery quote, point by point.

  • 1«Quote builder» opens the screen to build the windows on their drawing; «Send for signing» and «WhatsApp» send the customer the signing link; «Create sales order» passes it to Sales; «Accepted» and «Rejected» change the status; «Today's prices» recalculates the lines with the catalogue's current prices. Once accepted, «Send to production», «Order the material» and «Save the offcuts» appear.
  • 2The status. An accepted or rejected quote goes back to active with «Set back to active», unless it already has a sales order. The quote builder and signing only work with active quotes.
  • 3What hangs from the quote: the sales order, the measuring or installation appointments, production (how many openings are finished) and the material orders.
  • 4The customer, the job or address and the salesperson.
  • 5The rate (1, 2 or 3) says which % of each family is added. The adjustment % raises the price of all modules and materials (negative, it lowers it). The default % VAT is the one in the configuration.
  • 6The lines, the terms and remarks, and the customer's signature with the signing link.
  • 7Each line with the module drawing, where it goes, its measurements, colour, quantity, price and energy efficiency letter. Chapters are shown in bold.
  • 8The totals. Cost and margin are only visible to sales managers.

How it is done

  1. WinAlum › Quotes › New: choose the customer and type the job.
  2. Choose the rate and, if you want, an adjustment %.
  3. Save and press «Quote builder» to add the windows, or add them in the «Lines» tab.
  4. Check the total, print the quote (Print › Joinery quote) and send it for signing.
  5. When the customer accepts it, «Create sales order» makes the Odoo order (one section per chapter and one line per opening) and leaves the quote accepted.

3. Lines and how the price is worked out

Each line opens in a window. What you choose in «Type» decides what is asked for: chapter, module, material or charge.

Lines and how the price is worked out

▶ In motion: lines and how the price is worked out, point by point.

  • 1Chapter: groups what goes below it until the next chapter (ground floor, kitchen…). Module: a window, a balcony door, a door… with its cutting list. Material: a loose material or a table-priced material. Charge: an amount you type yourself (transport, installation…).
  • 2When you choose the module, its name, drawing and add-ons fill in automatically. «Location» is where it goes: kitchen, bedroom 1…
  • 3The opening's measurements in millimetres. If they are outside the module's minimum or maximum, a yellow warning appears.
  • 4The quantity. In a chapter, «Manual price» charges the price you type instead of the sum of what is inside; in a charge, the amount goes in «Typed price».
  • 5The price of one unit and the total. For windows, also the Uw, the efficiency letter and whether it meets the zone's CTE.
  • 6The module's add-ons (glass, cover strips, shutter…) with the material you choose, the text for the customer and the price breakdown, material by material, with its cost and sale price.

How it is done

  1. Each material in the cutting list is measured with its formula on the line's measurements and charged at its price in the line's colour (if it has no price in that colour, the «No colour» price applies).
  2. The family's % for the quote's rate is added to that amount; if the family has a purchase discount, the cost is the amount minus that %.
  3. The module's manufacturing hours (at the price of the workshop hours material) and the add-ons are added.
  4. On top come the configuration's % surcharge on modules and the quote's adjustment %.
  5. What is inside a chapter counts as many times as the chapter's quantity says.

4. The quote builder

The screen to build the quote window by window, as in GestioERP: you choose the module in the showcase, type the measurements on the drawing and see the price straight away.

The quote builder

▶ In motion: the quote builder, point by point.

  • 1The header: goes back to the quote and shows the customer, the job, the base and the total.
  • 2The quote lines by chapter. A click on an opening opens it to change it and the bin removes it; a click on a chapter makes new items go inside it. To create a chapter, type its name and press «Add chapter».
  • 3The module showcase with their drawings: search by module or series and filter by group with the buttons.
  • 4The chosen module: the window drawn to scale or the module drawing with its measurements, where it goes, the quantity, the colour (by default, that of the last opening), the measurements, the chapter and the material of each add-on.
  • 5Price and total are recalculated whenever you change anything, without saving. «Add to quote» saves it (or «Save changes» if you were editing it). If the measurements are outside what the module allows, a warning appears.

How it is done

  1. On an active, saved quote, press «Quote builder».
  2. If you want chapters, type the name (ground floor…) and press «Add chapter».
  3. Choose the module in the showcase, type the measurements and colour and choose the add-ons.
  4. Press «Add to quote» and go on with the next window.
  5. «Back to the quote» takes you to the record with everything calculated.

Keyboard

EnterIn «New chapter», creates the chapter

5. Catalogue: modules and their cutting list

Each module is a window, balcony door or door from a series, with the materials it uses and the formula for each one.

Catalogue: modules and their cutting list

▶ In motion: catalogue: modules and their cutting list, point by point.

  • 1The name, series and group (the quote builder uses them to search and filter), how many measurements it asks for (2 are width and height; more are C, D…) and the frame U for the energy calculation.
  • 2The size limits (the quote warns if they are exceeded) and the manufacturing hours, charged at the workshop hour price with their family's %.
  • 3The cutting list; the add-ons (glass, cover strips, shutter…), chosen from a family or a material type and with a default material; the drawings, and the quote texts.
  • 4Each material with its formula: A is the width and B the height. Examples: A-40, (A/2)-129, (2*A)+(2*B)-580, INT(B/600)+1. «Cut» is how the profile ends are cut (square or mitre).

How it is done

  1. WinAlum › Catalogue › Modules › New: name, series, group and measurements required.
  2. In «Cutting list», add each profile, glass or accessory with the formula for its cutting length and its quantity.
  3. In «Add-ons», what is chosen in each quote (the glass, the shutter…) with its length, width and quantity formulas.
  4. In «Drawings», make the module drawing with the designer (or upload an image): it appears in the quote, in the quote builder and in production.
  5. A badly written formula cannot be saved: the warning says what is wrong.

6. Module drawings: the designer

The drawings of each module are made inside the program, with the same WinAlum editors: the drawing generator, which draws the window or door from its sashes and divisions, and WA-Paint, the WinAlum 5 drawing editor. Then «Place measurements» puts on top the letters A, B… that the quote builder asks for.

Module drawings: the designer

▶ In motion: module drawings: the designer, point by point.

  • 1The three modes of the designer. When switching from one to another, anything not saved is lost.
  • 2Saves the drawing image (the one shown in the quote) and what was drawn, to open it and change it again. In «Place measurements» the button saves the letters.
  • 3The chosen editor. A drawing made with WA-Paint reopens in WA-Paint; an uploaded image opens as the background to draw on top.

How it is done

  1. Open the module and go to the «Drawings».
  2. Press «New drawing with the generator» or «New drawing with WA-Paint»: the drawing is created with the next number and the designer opens.
  3. Draw the window and press «Save the drawing».
  4. Switch to «Place measurements»: choose the letter, click on the drawing where its measurement goes, «Rotate» sets it vertical for heights, and press «Save the measurements».
  5. To change an existing drawing, open it in the «Drawings» tab and press «Design» or «Place measurements».
  6. «Back to the module» takes you back to the module form.

7. Catalogue: materials, families, colours and series

What gives each module its price: the materials with their price in each colour, the table-priced materials (price by width × height), the families with their % and the colours. Series carry their energy data and their tests.

Catalogue: materials, families, colours and series

▶ In motion: catalogue: materials, families, colours and series, point by point.

  • 1«Counted by» says how it is charged: per unit, per metre (profile) or per m² (glass, panel).
  • 2With a bar length, the material is a profile and goes into the cutting sheet. Minimum billable, glass type and its U belong to materials per m². The supplier is who it is ordered from.
  • 3The price for each colour. If a material has no price in the line's colour, the «No colour» price applies.
  • 4Families: the % for rates 1, 2 and 3 and the % purchase discount. Colours: their order, the on-screen colour and which one is «No colour». Table-priced materials: a price table by widths and heights. Series and tests: the manufacturer, the Uf and Uw, and the CE marking tests for each opening type.

How it is done

  1. Families: each rate's % is what is added to the material's amount to give the sale price.
  2. Table-priced materials: type the widths and heights separated by commas and, in «Prices», one row per height with one price per width separated by semicolons.
  3. In the quote, the cell of the first width and first height that reach the measurement applies (if it is larger, the last one).
  4. Series and tests: the series Uf is used in the energy calculation of its modules, and the «Tests (CE marking)» tab gives the performance in the declaration.

8. Measuring visits and appointments

On site, with the phone, you note each opening with its module, where it goes, width, height, colour, quantity and a photo. Then, with one button, the visit becomes a quote. Measuring and installation appointments go in the Odoo calendar.

Measuring visits and appointments

▶ In motion: measuring visits and appointments, point by point.

  • 1«Make the quote» creates a quote with one line for each opening that has a module, with its add-ons. The visit becomes «Quoted» and the «Quote» button opens it.
  • 2When you choose the customer, the job address fills in with theirs.
  • 3Who measured and the operator who went.
  • 4Each opening with the site photo or, if there is none yet, the module drawing. On the phone they appear as cards.

How it is done

  1. WinAlum › Measuring visits › New: choose the customer.
  2. In «Measured openings», add each opening: where it goes, module, width, height, colour, quantity and a photo.
  3. Back at the office, «Make the quote»: the address goes into the quote's job and the visit notes into its remarks.
  4. Appointments: in the quote, the «Appointments» button opens its own and creates a new one with the customer already set; also in WinAlum › Appointments: measuring and installation.
  5. In each appointment, choose the type (measuring, installation, repair or visit), the quote and the operator.

9. Workshop: cutting list, cutting sheet and offcuts

From each accepted quote you print the cutting list and the cutting sheet, and the leftovers that are still usable are kept as offcuts.

Workshop: cutting list, cutting sheet and offcuts

▶ In motion: workshop: cutting list, cutting sheet and offcuts, point by point.

  • 1The list shows the accepted quotes.
  • 2In the record, the Print menu produces the cutting list (each opening with its profiles, glass and accessories, with measurements and quantities), the cutting sheet and the workshop labels.
  • 3The cutting sheet spreads the cuts of each profile and colour over bars: each cut loses the blade thickness and each bar the waste, and it looks for the layout with the fewest bars.
  • 4WinAlum › Offcuts: what is in the warehouse. «Used» takes it out and «Back to warehouse» returns it.

How it is done

  1. WinAlum › Workshop: cutting list and cutting, and open the quote.
  2. Print › Cutting list (production sheet) for the workshop and Print › Cutting sheet for the saw.
  3. After cutting, «Save the offcuts»: the leftovers that reach the configuration's minimum offcut go to the warehouse. It is done only once per quote.
  4. The blade thickness, the waste per bar and the minimum offcut are changed in WinAlum › Configuration.

10. Production and times

One task per opening of the accepted quote, on a board by status that is also used on the phone. Each operator starts, pauses and finishes, and the time is recorded automatically.

Production and times

▶ In motion: production and times, point by point.

  • 1Cards are in columns by status: waiting, in progress, paused, finished and cancelled. Each one shows the drawing, quote, customer, measurements, colour, operator and hours.
  • 2«Start» opens a time slot for the task's operator or, if it has none, for your user's operator; «Pause» and «Finish» close it. «Cancel» and «Set back to waiting» are on the task form.
  • 3WinAlum › Workshop times: all the time slots with their hours and cost (hours times the operator's cost per hour), as a list or a pivot table by operator and quote.

How it is done

  1. In the accepted quote, «Send to production» creates one task per opening (V-1, V-2…); those that already have one are not repeated.
  2. Each operator opens Production (also on the phone) and presses «Start» on their opening.
  3. When stopping, «Pause»; when done, «Finish».
  4. In the quote, the «Production» button says how many are finished, and sales managers see the workshop hours and the labour cost.
  5. Operators are added in WinAlum › Operators, with their phone, their Odoo user and their cost per hour.

11. Material orders

What is needed to manufacture an accepted quote goes into Odoo purchase orders, one per supplier.

Material orders

▶ In motion: material orders, point by point.

  • 1The quote being ordered and the supplier for materials that have no supplier on their record.
  • 2The bars of each profile according to the cutting sheet, the m² of each glass and the units of each accessory, by colour. Change the quantity or leave it at zero if you already have it; stock is shown when Inventory is installed.
  • 3«Create the orders» creates one purchase order per supplier. The first time, each material is created automatically as a purchase product.

How it is done

  1. On an accepted quote, press «Order the material».
  2. Check the quantities and the supplier of each line.
  3. Press «Create the orders»: they are kept in WinAlum › Material orders and in Purchases, and the quote's «Material» button opens them.

12. CTE, energy label and CE marking

Each window has its energy calculation (Uw, letter and whether it meets the CTE for the climate zone) and its CE marking, with the series and configuration data.

CTE, energy label and CE marking

▶ In motion: CTE, energy label and CE marking, point by point.

  • 1If any window in the quote exceeds the climate zone's maximum Uw, a yellow warning appears at the top of the quote.
  • 2The Uw comes from the frame Uf (the series', the module's or, if neither, the one with or without thermal break, depending on whether the name contains «RPT») and the Ug of the chosen glass (or the default). The letter goes from A to G. The maximum Uw is the one you type or, otherwise, the zone's.
  • 3What appears in the declaration of performance and the CE label. The performance figures (air, water, wind and acoustic) come from the series test that matches each window's opening type.
  • 4The three documents are printed from the quote.

13. Signing by link and WhatsApp

The customer opens the quote with a link, looks at it, downloads it and signs it with a finger or the mouse. When signed it is accepted and the signature appears on the PDF.

How it is done

  1. On an active quote, «Send for signing» opens the email with the link for the customer.
  2. Or «WhatsApp»: opens a chat with the customer's phone and a text with the link.
  3. The link can also be copied from the «Customer signature» tab.
  4. The customer types their name, signs and presses «Sign and accept»: the quote becomes accepted, a note is left in the history and the tab shows who signed and when.

14. Import from WinAlum 5

Brings into Odoo what you have in WinAlum 5, using the WA5-ERP package that WAExportaERP makes on the WinAlum 5 computer.

Import from WinAlum 5

▶ In motion: import from WinAlum 5, point by point.

  • 1On the WinAlum 5 computer, WAExportaERP makes the package: a .zip or, in version 2, some .json files and the image .zip files.
  • 2Upload the files. «Update what is already there» rewrites what was already imported; unticked, it is left as it is. «Bring the images» brings the material photos and the module drawings. In «Quote years», the years separated by commas (2024, 2025); empty, all of them, and «0», none.
  • 3«Look at the package» tells you which company it is from, when it was made, how many images it has and, for each kind of item, how many there are and how many are already here. It writes nothing.
  • 4«Import» brings everything in order and at the end says how many are new, how many were updated, how many were already there and how many have errors, and what needs checking.

How it is done

  1. WinAlum › Import from WinAlum 5.
  2. Upload the package .zip (or the .json files and the image .zip files).
  3. Press «Look at the package» and check what is there.
  4. Choose the quote years and whether you want to update what is already there.
  5. Press «Import» and confirm: it is imported into the company you are working in.
  6. In this order, it brings material types, families, colours, customers, suppliers, materials with their prices by colour, groups and subgroups, table-priced materials, modules with their cutting list, add-ons and drawings, and quotes.
  7. Importing again duplicates nothing: each item keeps its «Number in WinAlum 5».

15. Wholesaler catalogue

The Excel or CSV file an aluminium or PVC wholesaler sends goes into the materials, with its price, family, bar length and photo. Each import can be undone.

Wholesaler catalogue

▶ In motion: wholesaler catalogue, point by point.

  • 1The file (Excel .xlsx or CSV, up to 12 MB) and the wholesaler, who becomes the supplier of each material. The family applies to rows without a family; the type and «Counted by», to new materials.
  • 2«Read the catalogue» finds the header row and assigns the columns by what their titles say; if AI is configured in GestioERP Accounting, it is asked instead. If one is wrong, change its number (-1 if the catalogue does not have it).
  • 3Update the materials already there (same code), create the families that are missing (with the % of «Family if none») and download the images from the image column.
  • 4Some rows of the file, with what each column is used for marked in green.
  • 5«Dry run» says how many materials would be new, how many are updated and how many new families, without writing anything. «Import» does it for real.

How it is done

  1. WinAlum › Catalogue › Wholesaler catalogue.
  2. Upload the file, choose the supplier and press «Read the catalogue».
  3. Check in the preview which column is what: the code column is required.
  4. Press «Dry run» and, if it looks right, «Import». The price goes into each material's «No colour» colour.
  5. If it is not what you wanted: WinAlum › Catalogue › Wholesaler imports › «Undo». New materials are deleted (or archived if already in use) and existing ones go back to how they were.

16. Configuration, Internal users and permissions

The configuration is per company. Each WinAlum section is given or removed in Internal users.

How it is done

  1. WinAlum › Configuration: «WinAlum in this company» (without it, the WinAlum menu does not appear), the % VAT for quotes, the % surcharge on modules and the workshop hours material (its price is what a manufacturing hour costs).
  2. For the workshop: the saw blade thickness, the waste per bar and the minimum offcut kept.
  3. Also the energy calculation and CE marking data, and the quote terms (they are copied into each new quote).
  4. The «WinAlum in this company» box is also on the company form, «WinAlum» tab, to switch it on where the menu does not appear yet.
  5. In Internal users, «Winalum GERP ODOO (joinery)» gives the dashboard and lets you see the catalogue, and each button is a permission: «Quotes and appointments», «Workshop: production, times, cutting, offcuts and operators», «Material orders to suppliers», «Catalogue: modules, materials, families, series» and «Joinery configuration».
  6. «Import from WinAlum 5» needs the configuration permission, and the wholesaler catalogue, the catalogue one.

Frequently asked questions

How do I make a joinery quote?
WinAlum › Quotes › New: choose the customer, job and rate, save and add the windows with «Quote builder» or in the «Lines» tab. The price comes from the catalogue automatically. When the customer accepts it, «Create sales order» makes the Odoo order and leaves the quote accepted.

How do I use the quote builder?
On an active, saved quote, press «Quote builder». Choose the module in the showcase (search by module or series or filter by group), type the measurements, colour and where it goes, choose the add-ons and press «Add to quote». The price is calculated straight away and it warns if the measurements are outside the module's limits.

How is a window's price calculated?
Each material in the cutting list is measured with its formula on the width and height and charged at its price in the line's colour (or the «No colour» price); its family's % for the rate is added. Manufacturing hours and add-ons are added, and on top the surcharge on modules and the quote's adjustment %. The line's «Price breakdown» tab shows it material by material.

What is a quote chapter?
A chapter groups what goes below it until the next one (ground floor, kitchen…). Its price is the sum of what is inside, times its quantity; with «Manual price» it charges what you type. A charge is a line with an amount typed by hand, such as transport or installation.

What are the rate and the adjustment % for?
The rate (1, 2 or 3) picks which % of each family is added to the amount of its materials. The adjustment % raises the price of all modules and materials in the quote; negative, it lowers it. The % for each rate is set in WinAlum › Catalogue › Families.

How do I put new prices on a quote?
A quote keeps the prices of the day it was made. «Today's prices» recalculates all its lines with the catalogue's current prices.

How do I create a module?
WinAlum › Catalogue › Modules › New: name, series, group and measurements required. «Cutting list» holds each material with the formula for its length and quantity: A is the width and B the height (C, D… the others). Examples: A-40, (A/2)-129, INT(B/600)+1. «Add-ons» holds what is chosen in each quote, and «Drawings», the drawing.

How do I set a material's price in each colour?
On the material form, «Prices by colour» tab, one line per colour with its price (per unit, per metre or per m², depending on «Counted by»). If it has no price in the line's colour, the «No colour» price applies. With a bar length, the material is a profile and goes into the cutting sheet.

What is a table-priced material?
A material with a price table by widths and heights (mosquito nets, shutters…). In WinAlum › Catalogue › Table-priced materials, type the widths and heights separated by commas and one row of prices per height. In the quote, the cell of the first width and first height that reach the measurement applies.

How do I record a measuring visit?
WinAlum › Measuring visits › New: choose the customer (the address fills in) and, in «Measured openings», each opening with where it goes, module, width, height, colour, quantity and a photo. Back at the office, «Make the quote» creates the quote with one line per opening and the visit becomes quoted.

How do I book a measuring or installation appointment?
From the quote, the «Appointments» button opens its appointments and creates a new one with the customer and quote already set. Also in WinAlum › Appointments: measuring and installation, which is the Odoo calendar with only the joinery appointments. In each one, the type (measuring, installation, repair or visit) and the operator.

How do I send the quote for the customer to sign?
On an active quote, «Send for signing» sends it by email and «WhatsApp» opens a chat with the customer's phone and the link; the link is also in the «Customer signature» tab. The customer looks at it, types their name, signs and presses «Sign and accept»: the quote is accepted and the signature appears on the PDF.

How do I send a quote to production?
In the accepted quote, «Send to production» creates one task per opening. In WinAlum › Production (also on the phone) each operator presses «Start», «Pause» and «Finish», and the time is recorded automatically. Hours and their cost appear in WinAlum › Workshop times and, for sales managers, on the quote.

How do I get the cutting sheet?
WinAlum › Workshop: cutting list and cutting lists the accepted quotes. In the record, Print › Cutting sheet spreads the cuts of each profile and colour over the fewest bars, counting the blade and the waste; Print › Cutting list gives the material for each opening. Then «Save the offcuts» sends the leftovers that reach the minimum offcut to the warehouse.

How do I order the material from suppliers?
In the accepted quote, «Order the material» works out the bars of each profile according to the cutting sheet, the m² of each glass and the units of each accessory, by colour. Change what you want, choose the supplier for items without one and press «Create the orders»: one purchase order per supplier.

How do I know if a window meets the CTE?
Each window in the quote works out its Uw from the frame Uf and the glass Ug, its letter (A to G) and whether it meets the climate zone's maximum Uw; if any does not, the quote shows a warning. Print › Energy calculation (CTE), CE marking: declaration of performance (DoP) and CE marking: labels produce the documents. The zone and the CE data are set in WinAlum › Configuration.

How do I bring in the WinAlum 5 data?
On the WinAlum 5 computer, WAExportaERP makes the WA5-ERP package. In WinAlum › Import from WinAlum 5 upload it, press «Look at the package» (it writes nothing) and then «Import». The catalogue, customers, suppliers, modules and the quotes for the years you choose are brought in. Importing again does not duplicate: what is already there is skipped or, with «Update what is already there», updated.

How do I import a wholesaler's catalogue?
WinAlum › Catalogue › Wholesaler catalogue: upload the Excel or CSV file, choose the supplier and press «Read the catalogue»; the columns are assigned by their titles (or by AI, if configured). Correct what is needed, press «Dry run» and then «Import». It is undone in WinAlum › Catalogue › Wholesaler imports › «Undo».

Why can't I see the WinAlum menu?
WinAlum only appears in companies with «WinAlum in this company» ticked (WinAlum › Configuration, or the «WinAlum» tab of the company form) and to people with the permission in Internal users: «Winalum GERP ODOO (joinery)» gives the dashboard, and there is one permission per part: quotes and appointments, workshop, material orders, catalogue and configuration.

How do I draw a module?
WinAlum › Catalogue › Modules: open the module, «Drawings» tab, and press «New drawing with the generator» or «New drawing with WA-Paint». Draw, press «Save the drawing» and, in «Place measurements», put the letters A, B… where each measurement goes and press «Save the measurements». An existing drawing is changed with «Design».

Aluminium and PVC joinery: quotes by chapters with the drawing of each window and the price material by material, quote builder, measuring visits with the phone, appointments, signing by link, production with times per operator, cutting list and cutting sheet with offcuts, material orders, CTE and CE marking, the module and material catalogue, and importing from WinAlum 5 and from the wholesaler catalogue.

Rating
0 0

There are no comments for now.

to be the first to leave a comment.